Installation Requirement

Installation Requirement

Release Time:2018.02.07

  1. INSTALLATION ENVIRONMENT: Install the lift in a dry place with normal temperatures
  2. CONCRETE: Concrete must be a thickness of 4” minimum and without reinforcing steel bars, and must be dried totally before installation; Concrete must be in good condition and must have a test strength of 3,000psi (200kg/cm2) minimum; Floors must be level with no cracks; Make sure there is enough space for the model installation.
  3. POWER SUPPLY: The electrical source must be 120 V or 220 V minimum, depending on the lift.
  4. AIR SUPPLY: Air pressure requirement: 72psi~116psi.
Call AMGO Lifts Now